T J KOTTEESWARAN
- MAPS to take at least 1 month for resumption of operationsAuthorities were forced to 'cold shutdown' the reactor after it tripped yesterday following a fault in the generator transformer high volta...
- MAPS to take at least 1 month for resumption of operationsThe resumption of operation of 110 MWe second unit of Madras Atomic Power Station (MAPS) at Kalpakkam, would take at least a month.
- Madras Atomic Power Station unit II trips; Reactor cold shutdownThe second unit of the Madras Atomic Power Station (MAPS) at Kalpakkam near here tripped, forcing authorities to cold shutdown the reactor.
- Load More