Searched for
ONGC JORHAT ASSET
IGGL, ONGC signs three agreements to connect ONGC’s Natural Gas fields with North East Gas GridIndradhanush Gas Grid Ltd is laying a 1656 km long Natural Gas pipeline connecting the capital cities and the demand centres of all the eig...
MEIL hands over second oil rig to ONGC; to supply 21 more by 2022The delivery is a part of the Rs 6,000 crore order Megha Engineering and Infrastructures Ltd (MEIL) had won from ONGC for the supply of 47 ...
MEIL to deliver $860 million worth 47 oil & gas rigs to ONGC by 2022 endOut of 47 Rigs, there are 20 Workover Rigs-(used to perform workover operations in a well) and 27 Land Drilling Rigs.
ONGC may shift proposed basin from Tripura to AssamThe ONGC board is likely to take a decision on the upcoming second basin of North East in the next six months.
ONGC puts two oil wells discovered in Assam on productionThe Director (Onshore) said, " In North Tripura’s Kubal ONGC had five wells, in two wells we got good results in other two we did not had m...
ONGC to roll out new 'basin' in Agartala by 2017ONGC's North East operations are divided into two areas -- Assam Shelf from Jorhat to Duliajan and Assam Fold Belt from Silchar to Agartala.
ONGC crosses daily production target; revises annual goalThe daily production of the company has already touched 16,300 tonnes compared to 15,300 tonnes in August 2015, he added.
- Oil blockade hits ONGC operations in Assam
ONGC's crude oil and natural gas production has been hit by a 96-hour oil blockade by an influential students' group.