6.59 KM TUNNEL
Breakthrough in Rishikesh-Karnaprayag project: Railways tackles one of its toughest Himalayan stretches; how close is the 125-km line to becoming operational?Rishikesh-Karnaprayag project: Indian Railways has achieved a major breakthrough in the 6.59-km-long Tunnel-14 of the Rishikesh-Karnaprayag...
- Load More