Searched for
RAPIDX START
RAPIDX corridor between Ghaziabad to Meerut South likely to be completed in six months: OfficialsThe viaduct work and track laying on the second phase, from Duhai to Meerut South station, is also almost completed. The corridor will have...
10 Sep, 2023, 12.52 PM IST
After overhead bridge construction, Delhi-Meerut RAPIDX now completes tunneling work, tracks to be laid soonThe Delhi-Ghaziabad-Meerut RAPIDX corridor project has achieved a major breakthrough with the completion of a 2km-long tunnel segment betwe...
30 Aug, 2023, 05.28 PM IST
Rapidx completes bridgework till Meerut, half of Sahibabad-Duhai-Meerut South track also laidThe Delhi-Ghaziabad-Meerut RAPIDX corridor has completed the 25-kilometer viaduct work between Duhai and Meerut South stations. A 17-kilome...
21 Aug, 2023, 02.44 PM IST
RAPIDX starts operation at 160 kmph, covers 17 km distance in 12 mins, public opening soonEmpty RAPIDX trains have started testing for technical issues on the 17-kilometre priority section between Sahibabad and Duhai depot, with ...
12 Aug, 2023, 02.01 PM IST
Log9 Materials inaugurates InstaCharge Station in Bengaluru, plans charging infra for other citiesWith its InstaCharge Stations, Log9 aims to provide the throughput that the fleet operators require to efficiently work on their deliveries...
23 Dec, 2021, 07.07 PM IST
Hero Electric joins hands with Log 9 Materials for InstaCharging battery packs"Our InstaCharge batteries on Hero vehicle platform will provide the 'power, performance and peace of mind' for the B2B last-mile delivery ...
14 Dec, 2021, 01.20 PM IST