ISRO completes second orbit raising manoeuvre of GSAT-14ISRO said the Apogee Motor of GSAT-14 was fired for 2,629 seconds with a realised orbit of 32,160 km Perigee, nearest point to earth.
07 Jan, 2014, 06.45 PM IST
Kerala assembly pats ISRO on achieving cryo technologyKerala Assembly congratulated Indian Space Research Organisation on successful launch of GSLV-D5 & joining the elite club of countries with...
06 Jan, 2014, 01.32 PM IST
ISRO launches indigenous cryogenic engine-powered GSLV-D5ISRO launched the GSLV-D5, powered by an indigenous cryogenic engine and carrying the GSAT-14 satellite from the Satish Dhawan Space Centre...
05 Jan, 2014, 10.01 PM IST
ISRO plans more GSLVs and experimental Mark III launchesISRO is planning a series of GSLV launches and an experimental launch of the advanced version GSLV Mark III soon from the spaceport.
05 Jan, 2014, 09.10 PM IST
Preparations 'going on smoothly' for GSLV-D5 launchGSLV-D5, powered by an indigenous cryogenic engine, will inject the GSAT-14 communication satellite into geosynchronous transfer orbit.
05 Jan, 2014, 03.33 PM IST
Failures behind, GSLV-D5 ready to fireThe Sriharikota launchpad became active after the mission readiness review team and the launch authorization board cleared the launch on De...
05 Jan, 2014, 11.04 AM IST
29-hour countdown for launch of GSLV-D5 commencesThe 29-hour countdown for launch of ISRO's rejuvenated Geo-synchronous Satellite Launch Vehicle commenced at 11.18 AM at Satish Dhawan Spac...
04 Jan, 2014, 01.25 PM IST
Successful GSLV launch on Sunday important for ISROFirst one failed in April, milliseconds after the final stage ignited. The second flight, in December, was destroyed just under a minute af...
04 Jan, 2014, 11.14 AM IST
GSLV-D5 integrated with GSAT 14 satelliteGSLV-D5 with indigenous cryogenic engine has been integrated with the communication satellite GSAT 14.
26 Dec, 2013, 09.53 PM IST
ISRO's MMR team to decide on GSLV-D5 launch on December 27The flight test of rejuvenated GSLV-D5 with indigenous cryogenic engine is likely to take place on Jan 5 from the space port of Sriharikota...
22 Dec, 2013, 03.41 PM IST
ISRO's GSLV D5 launch likely early next monthThe integration of the second stage of GSLV D5 has already been completed and integration of the cryogenic stage is planned on December 9, ...
03 Dec, 2013, 12.07 PM IST
GSLV flight with indigenous cryogenic engine only in December: ISROThe flight-test of GSLV with indigenous cryogenic engine is now expected to take place only in December, ISRO said on Wednesday.
28 Aug, 2013, 06.24 PM IST
ISRO calls off GSLV D-5 launch after fuel leakageISRO today called off the launch of rocket GSLV D-5 carrying a satellite from the Satish Dhawan Space Centre here due to fuel leak.
19 Aug, 2013, 05.00 PM IST
Countdown for launching GSLV-D5 to commence on August 18Crucial launch is scheduled at 4.50 PM on August 19 from the second launchpad of Satish Dhawan Space Centre at Sriharikota.
14 Aug, 2013, 09.34 PM IST
GSLV-D5 launch fixed for 4.50 pm on August 19In a crucial launch, India's GSLV-D5, powered by indigenous cryogenic upper stage and carrying communication satellite GSAT-14, is set for ...
12 Aug, 2013, 05.39 PM IST
Arianespace to launch India's INSAT-3D spacecraft on July 26European space consortium Arianespace would launch India's INSAT-3D, an exclusive meteorological satellite, from its spaceport of Kourou in...
13 Jun, 2013, 05.20 PM IST
- ISRO successfully tests indigenous cryogenic engine
In a major step, ISRO today successfully tested the indigenous cryogenic engine to be used to propel the country's Geosynchronous Satellite...
12 May, 2012, 10.20 PM IST