MEDHA BOGIES FACTORY
India becoming major railway products manufacturer and exporter: Ashwini VaishnawDuring the visit, the Minister reviewed various stages of the manufacturing process and interacted closely with engineers and manufacturing...
Rajasthan: Vande Bharat sleeper train hits 180 kilometres per hour mark during trialsThe Vande Bharat sleeper train achieved 180 kilometres per hour during trials in Kota. This high-speed test was conducted in both loaded an...
New, upgraded Vande Bharat trains to cost about Rs 115 crore each: Officials"The cost of manufacturing a 16-coach Vande Bharat train would be roughly Rs 110 crore to Rs 120 crore. You may say, it is Rs 115 crore on ...
- Load More