Searched for
KAVACH VERSION 4.0
'Nobody will fly': India's plane versus train battle gets a twistIndia's Railway Minister said upcoming bullet trains will dominate short-haul routes like Mumbai-Pune and Bengaluru-Chennai, mirroring glob...
Indian Railways fast-tracks safety with ₹1,364 cr Kavach pushIndian Railways has approved projects totaling over ₹1,300 crore to enhance safety and communication systems. These initiatives include the...
Automatic train protection system Kavach commissioned on 472-km route: Indian RailwaysIndian Railways has achieved a significant safety upgrade, commissioning the Kavach automatic train protection system on a record 472.3 rou...
ET Graphics: AI Summit lays out red carpet for India’s sovereign AI dreamsAs India accelerates efforts to build a sovereign AI stack, a dozen startups and institutions backed by the government’s IndiaAI Mission ar...
Kavach installation: Railways misses 2nd deadline on Mumbai- Delhi- Kolkata route, eyes 2026Indian Railways faces a delay in installing the Kavach automatic train protection system. The New Delhi-Mumbai and New Delhi-Howrah routes ...
Vande Bharat sleeper trains delayed? Railway Ministry flags issues on berth areas, window curtain handles and moreVande Bharat sleeper train operations are facing a delay. The Railways Ministry has identified issues with furnishings and workmanship. Whi...
India to develop Vande Bharat 4.0 with an eye on export ambitionsRailway Minister Ashwini Vaishnaw announced the development of Vande Bharat 4.0, the next-generation semi-high-speed train, with a focus on...
Advanced version of Kavach ready for commissioning on 324 km of Mathura-Kota section: VaishnawThe government informed Parliament that Kavach 4.0, an advanced automatic train protection system, is ready for commissioning on the 324 km...
HBL Engineering shares jump 5% after bagging Rs 133 cr railway contract for Kavach safety systemHBL Engineering, in a stock exchange filing, said the Kavach implementation project spans the 446-km Vijayawada–Ballarshah section, coverin...
HBL Engineering shares skyrocket 9% after winning Rs 762-crore order from Central RailwayHBL Engineering shares rose 9.2% on securing five contracts worth Rs 762.56 crore from Central Railway for Kavach. The total value of Kavac...
India will emerge very powerful, very strong: Union Minister Ashwini Vaishnaw at ET AwardsIndia, under the guidance of Minister Ashwini Vaishnaw, aims to become a significant technology creator in the AI era, leveraging public-pr...
Deadline to install 'Kavach' on Mumbai-Delhi-Kolkata train route extended to December '25The Railway Board has extended the deadline for installing the Kavach Automatic Train Protection System on the Delhi-Mumbai and Delhi-Kolka...
Economic Survey 2024-25: Rail network expansion comes down; production of wagons, locos upThe Economic Survey 2024-25 indicated a 10% decrease in rail network expansion, yet noted a rise in rolling stock production. Key figures i...
Railways saw progress on several projects in 2024 but faced persistent challengesIn 2024, Indian Railways made significant strides with new train services, infrastructure development, and recruitment. However, challenges...
Indian Railways gears up to equip Kavach 4.0 across its key routesThe implementation of Kavach 4.0 by Indian Railways across its key routes is a broader initiative to modernize its infrastructure and impro...
Railways switches to fast track for Kavach rolloutIndian Railways is accelerating the deployment of its automatic train protection system, Kavach, aiming to equip 90% of its network by 2030...
RailTel shares tumble 7% post Q1 earnings; brokerage maintains 'Sell' ratingRailTel Corporation of India's shares fell by 7% following its June quarter results. The company reported a year-on-year increase in net pr...
First Vande Sleeper is ready and undergoing tests: Ashwini VaishnawUnion Railways Minister Ashwini Vaishnaw announced that the first Vande Bharat sleeper train is ready and undergoing tests. This train, des...
Railway Ministry allocates Rs 1,112.57 cr for Kavach in 2024-25: VaishnawIndian Railway Minister Ashwini Vaishnaw disclosed that Rs 1,112.57 crore was set aside for installing the ATP system Kavach in 2024-25. So...
Gross budget allocation for Northeast Frontier Railway for the FY 2024-25 is Rs 14184.69 cr: Railway minister Ashwini VaishnavAshwini Vaishnaw, Union Minister for Railways, announced a significant budget allocation of Rs. 14,183.69 crores for Northeast Frontier Rai...