JSW MG Motor launches Hector Tomahawk EV, PHEV: Check price, range, featuresJSW MG Motor India has launched the Hector Tomahawk in electric and plug-in hybrid versions. These new models are available under a Battery...
26 Aug, 2026, 02.29 PM IST
Canada turned discarded aluminum into submarine fuel by reacting it with water; up to 12 Type 212CD boats can use hydrogen fuel cells to remain submerged for 41 daysCanada aims to enhance its submarine fleet with a technology that converts aluminum into hydrogen. GH Power is collaborating with TKMS to e...
25 Aug, 2026, 09.27 PM IST
Piyush Goyal promises BIS certification relief for high-tech sector firmsGoyal said he had taken note of concerns raised by Japanese companies over BIS certification requirements and that the government had alrea...
25 Aug, 2026, 06.38 PM IST
India bets on battery storage boom to reduce solar power lossesThe current grid infrastructure is causing marked energy loss during high-demand summer periods. To combat this, developers are integrating...
25 Aug, 2026, 11.52 AM IST
18-year-old California student Colin Jie Chu built a model to predict EV battery health with 2.36% error. His research wins top US science award18-year-old California student Colin Jie Chu developed a model to predict the health and lifespan of electric vehicle batteries, achieving ...
24 Aug, 2026, 09.06 PM IST
PLI 2.0 for mobiles set to reward scale, exports; Dixon a key beneficiary: Motilal OswalThe government’s new mobile phone manufacturing incentive scheme is set to favour companies with scale, export capabilities and strong dome...
24 Aug, 2026, 12.42 PM IST
India may see major growth in sodium-ion batteries as technology reaches TRL-7: Renewable Energy SecretaryTechnology Readiness Level (TRL) is a scale used to assess the maturity of a technology, with TRL 7 indicating that a system prototype has ...
24 Aug, 2026, 10.27 AM IST
Citigroup, Axis Bank team up to leverage NRI deposits as RBI dollar inflows surgeCitigroup and Axis Bank have tied up to finance non-resident Indians investing in foreign-currency deposits, leveraging RBI rules that allo...
24 Aug, 2026, 08.18 AM IST
Need to scale storage capabilities amid growing RE capacity: Industry expertsIndia's renewable energy growth demands more storage systems now. Domestic battery manufacturing capacity remains very low compared to futu...
23 Aug, 2026, 02.52 PM IST
Apple may expand manufacturing in India beyond iPhonesIn an effort to bolster its device manufacturing sector, India has launched a new scheme aimed at enticing industry leaders like Apple and ...
22 Aug, 2026, 12.55 PM IST
In 2024, New Jersey regulators halted a floating solar project on the 2,000-acre Wanaque Reservoir. 2 years later, a 10-MW state incentive revived plans for what could become America's largest floating solar farmWanaque Reservoir floating solar is back in development, with New Jersey supporting a new 10 MW project on a major drinking-water reservoir...
21 Aug, 2026, 09.06 PM IST
India-designed mobile phones likely in 10-14 months under MPMS; no place for copycats: Ashwini VaishnawNew indigenously designed mobile phones with Indian IP rights will launch in 10-14 months. The government will strictly screen brands, prev...
21 Aug, 2026, 08.58 PM IST
India aims 30 GW polysilicon manufacturing capacity by 2030: MNRE SecretaryIndia plans to add thirty gigawatts of polysilicon manufacturing capacity by twenty thirty. This ambitious goal aims to attract an investme...
21 Aug, 2026, 05.16 PM IST
Mobile phone makers with turnover of Rs 10,000 cr in FY26 eligible for MPMS: GovtThe government’s Rs 62,500-crore Mobile Phone Manufacturing Scheme (MPMS) will cover mobile phone makers and electronics manufacturing serv...
21 Aug, 2026, 05.04 PM IST
India's battery storage self-reliance a decade away amid tech, financing and execution delays: ReportIndia has just 2 GWh of commissioned cell manufacturing capacity as of 2026, against China's cumulative capacity of 2,695 GWh, the report s...
20 Aug, 2026, 06.54 PM IST
Ola Electric gets revised ACC PLI timeline, eyes Rs 7,240 crore incentive payout through 2031Ola Electric's subsidiary received revised timelines for the ACC PLI scheme. This approval secures a full five-year incentive window throug...
12 Aug, 2026, 12.54 PM IST
Ola Electric gets two-year extension on cell-manufacturing PLI milestonesThe revised timeline secures Ola Electric a five-year PLI window through 2031 and could unlock up to Rs 7,240 crore in cumulative incentive...
12 Aug, 2026, 10.44 AM IST