BHUSWAL THERMAL POWER
Coal demand keeps 11,500 MW of thermal generation capacity idleA 500 MW unit at the Indira Gandhi Super Thermal Power Plant, which was lying shut since October 2, could be made operational as coal was m...
Decommissioned thermal power units to soon lose their fuel supplyThe move is expected to release 35 million tonnes of coal as some 2,000 MW of thermal power capacity has been shut after having completed i...
- Load More