Searched for
ALAKNANDA ROAD
Karma, climate and consequences: As the Char Dham Yatra reopens, a warming Himalaya reveals karma in its oldest public senseA road journey through Uttarakhand’s mountain towns reveals a deeper shift in both climate and pilgrimage. Unusual heat, felt by locals as ...
2 IAF personnel drown in Nainital lake as heavy rains pound UttarakhandAmidst heavy rains in Uttarakhand, two IAF personnel drowned in Bhimtal lake, prompting rescue operations. The severe weather has disrupted...
Uttarakhand: Passenger movement halted after Badrinath-Rishikesh highway blocked due to heavy rainsHeavy rainfall in Uttarakhand has disrupted passenger movement, blocking the Badrinath-Rishikesh highway and halting pilgrimages to Badrina...
Villagers blame wrath of demolished Baukhnaag Devta for tunnel collapse in UttarkashiVillagers in Uttarkashi believe that the recent collapse of the Silkyara-Polgaon tunnel is a result of the wrath of the local deity Baukhna...
Delhi has 117 traffic choke points: Here is traffic police's plan to ease congestionDelhi Traffic Police has conducted a survey to identify 117 key points in the city where heavy traffic congestion occurs. The survey aims t...
Badrinath National Highway shows fresh signs of subsidence after crack appearThe subsidence-sensitive spot has been demarcated with reflective tapes for the safety of vehicles and drivers are being asked to drive car...
Uttarakhand: Gangotri national highway blocked due to landslide, restoration underway"The Gangotri National Highway has been blocked due to a massive landslide near Purana Thana Dharasu Bandh. Dozens of vehicles are stuck in...
Massive shelf cloud formation captivates Haridwar amid heavy rainsA massive shelf cloud was captured on video in Haridwar, Uttarakhand, amidst heavy rainfall across North India. The cloud, often associated...
Centre approves Rs 1,210 cr highway projects in UttarakhandThe projects include rehabilitation and upgradation of Askot - Lipulekh on EPC basis for Phase-I under project Hirak of Border Roads Organi...
Fate of NTPC’s Tapovan project hangs in balance after Rs 1,500 crore lossThe company, however, told the BSE on Monday that the “damage may not be considered material or significant” as per Sebi norms in the light...
Alaknanda Road carries three time more traffic than capacity: CSE studyCSE said that piecemeal solutions at local level will not work and there is need for integrated street design and management, improved conn...
Massive landslide disrupts Badrinath yatra, no casualties reportedNo casualties were reported although sources said that four machines, kept for road-clearing, were struck by heavy boulders and pushed into...
Rains continue in Uttarakhand, rivers in spateSeveral places in Uttarakhand received moderate to light rains on Monday.
Heavy overnight rains in Uttarakhand, rivers close to danger markHeavy overnight rains across Uttarakhand today led to a rise in the levels of most water bodies including the Bhagirathi river.
Uttarakhand: Relief operations speeded up as weather relentsNearly 8,000 quintals of food material were carried to Rudraprayag, Chamoli, Uttarkashi and Pithoragarh districts by choppers and mules.
Bad weather hits relief work, Uttarakhand government to requisition choppersThe state Disaster Management and Mitigation Department will hold an emergency meeting on Sunday to discuss how choppers capable of flying ...
Uttarakhand floods: Nature's fury evident in townsOn the way up from Dehradun to Guptkashi, the destruction along the river bank, on the roads and dwellings of locals is clearly visible.
Uttarakhand: Ripped apart, stitch-back begins slowlyIn the absence of roads, many of which have dissolved into the Ganga, Alaknanda and Bhagirath, rescue will be slow and rehabilitation tortu...
- GVK to commence hydro electric project in J&k this year
GVK Power and Infrastructure would commence work on its 690 MW hydro-electric power project in J&K by December.
- GVK Power’s hydro project to go on stream before schedule
Infrastructure developer GVK Power and Infrastructure (GVKPIL) is set to complete its Rs 2,069-crore Alaknanda hydro power project in Rishi...