What is the Sheshnag Lake row?

Construction near Sheshnag Lake has faced criticism from politicians and environmentalists over safety and ecological concerns. The Border Roads Organisation is executing the project, which is connected to National Highway 501. The Supreme Court h...

Agencies
A video of JCBs working near the Sheshnag Alpine Lake, located at an altitude of 3,590 m in the mountains leading to the Amarnath cave, has triggered widespread condemnation. Sheshnag is among the 14 high-risk glacial lakes in J&K. Politicians, religious leaders, environmentalists and citizens have called for immediate halt to construction, fearing that it may threaten pilgrims’ safety, pristine environment and result in another disaster like in Kedarnath and Nepal.

The project in the ecologically sensitive zone is being executed by the Border Roads Organisation.

IS THE PROJECT PART OF NATIONAL HIGHWAY 501?


CPI(M) MLA Muhammad Tarigami said this work cannot be viewed separately from the Khanabal-Baltal highway, NH-501. The project’s design report, prepared by NHIDCL in January 2024, proposes 2- or 4-laning of about 90 km of road from Khanabal to Baltal. It includes a new stretch from Chandanwari to Baltal along the traditional yatra route. As per NHIDCL, after Chandanwadi, the project road traverses as a greenfield alignment, where there are only the foot trails of the Amarnath yatra. This part is in the high Himalayan ranges, where the highest point is Ganesh Top at an elevation of about 4,400 m. There is a proposal for a 10.8 km tunnel from Jojibal near Sheshnag Lake to Panchatarani.

WHAT IS BRO’S POSITION ON THE CONSTRUCTION?

BRO has stated that it takes all measures to safely dispose of excavated material, protect natural drainage and minimise disturbance to the surrounding terrain. “The recently circulated video on social media regarding the new works is incorrect. Based on the experience of the previous yatra and the requirements highlighted for a wider road, BRO has started widening tracks, focusing on stabilising vulnerable stretches to ease congestion and allow safer passage.” The track was handed over to BRO in 2022.
ADVERTISEMENT

WHAT’S THE SUPREME COURT RULING ON ROAD WIDENING?

Following the 2012 incident, when around 130 people were killed during the yatra, the Supreme Court took up the matter on its own and constituted a special highpowered committee. After the SHPC report in September 2012, SC in its judgement on December 13, 2012, accepted the recommendations and set up a subcommittee to make sure they were followed. SC mentioned the need for a regular track width of at least 12 feet, citing the difficulties faced by pilgrims, horses and palkis, particularly in adverse weather conditions.

WHY WAS NITISH SENGUPTA PANEL FORMED?

In 1996, bad weather struck the Amarnath route and claimed over 250 lives following which the government appointed Nitish Sengupta committee. He recommended restriction on the size of pilgrims, age limit on yatris (between 15 years and 65 years) and no more than 10,000 pilgrims per day between Chandanwari and the Holy Cave.
Download
The Economic Times Business News App
for the Latest News in Business, Sensex, Stock Market Updates & More.
Download
The Economic Times News App
for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.
READ MORE
ADVERTISEMENT

READ MORE:

LOGIN & CLAIM

50 TIMESPOINTS

More from our Partners

Loading next story
Business News › News › India › What is the Sheshnag Lake row?
Text Size:AAA
Success
This article has been saved

*

+