Tejas Mk-1A: What’s new in India’s indigenous fighter jet, why has the IAF waited so long?

The Indian Air Force plans to induct its first squadron of indigenously developed Light Combat Aircraft Tejas Mk-1A by March 31, 2027. This induction is critical for restoring the IAF's dwindling fighter squadron strength, which currently stands a...

Agencies

India's indigenous Tejas Mk-1A fighter jet, expected to join the Indian Air Force by March 2027, features upgraded radar, avionics and electronic warfare systems. (File photo)

The Indian Air Force (IAF) is expected to induct its first squadron of indigenous Light Combat Aircraft (LCA) Tejas Mk-1A by March 31, 2027, bringing an end to a prolonged wait for the upgraded fighter. Air Chief Marshal Ashutosh Dixit said on Monday that the aircraft would join the fleet within the current financial year (FY 2026-27), while the next-generation Tejas Mk-2 is expected to roll out in 2027.

"Very shortly, we will have LCA Mark 1A joining the Indian Air Force; within this financial year we will have a squadron," Dixit said while addressing the ANI National Security Summit 3.0 in Delhi.

The induction is significant for the IAF, whose fighter squadron strength has fallen to 29 against a sanctioned requirement of 42, according to The Times of India (TOI). The Air force has contracted for 180 Tejas Mk-1A aircraft in two batches of 83 and 97.


Also read: IAF to get advanced LCA Tejas fighter jet boost soon: Mark 1A induction by March, Mark 2 in 2027, says Air Chief Marshal

What does Tejas Mk-1A bring to the IAF?

The Mk-1A is an upgraded version of the earlier Tejas fighter, with improvements in avionics, sensors, electronic warfare capabilities and maintenance.
ADVERTISEMENT

According to TOI, its key upgrades include:

  • AESA radar: An Active Electronically Scanned Array radar to improve detection and tracking capabilities.
  • Electronic warfare systems: An advanced self-protection jammer and improved radar warning receiver.
  • Upgraded avionics: An improved mission computer and digital flight-control computer.
  • Enhanced cockpit: Smart multifunction displays.
  • Improved maintenance: Design changes to make the aircraft easier to maintain and improve serviceability.
These enhancements are intended to improve situational awareness, survivability and combat effectiveness compared with the earlier Initial Operational Clearance (IOC) and Final Operational Clearance (FOC) configurations.

Also read: 6th-gen Indian fighter jet in 4 years? Noida company chief makes big claim as India targets 2035 for 5th-gen plane

The Mk-1A shares the basic airframe and GE F404-IN20 engine with the earlier Tejas aircraft.
ADVERTISEMENT

Why has the Tejas Mk-1A programme been delayed?

Deliveries of the initial batch of 83 aircraft were originally scheduled to begin in February 2024. However, integration-related issues and delays in the supply of engines pushed back the timeline.
ADVERTISEMENT

Dixit also explained that the development process involved identifying and addressing shortcomings in the initial Tejas aircraft. The IAF identified four areas requiring improvements and worked with Hindustan Aeronautics Limited (HAL) to address them. The Air Force also provided one Tejas aircraft from its inventory to support the development of the Mk-1A.

Nashik, Oct 17 (ANI): LCA Tejas Mk1A completes maiden flight as the Union Defenc...
LCA Tejas Mk1A completes maiden flight as the Union Defence Minister Rajnath Singh inaugurates the third Tejas production line and the second HTT-40 line, at HAL in Nashik on Friday. (File Photo)
"So those four areas are almost complete. In between, DRDO had developed new weapons, we got them integrated, and we did a tremendous amount of flight tests," Dixit said.

He explained that testing often revealed additional areas requiring improvements, extending the development process.

"So this kept slipping in a manner of speaking because when you do test you find some other area which you need to improve and you improve," he said.

Dixit also highlighted the scale of the indigenous programme, saying around 600-700 work centres and laboratories across India, including IITs, railway laboratories and CSIR facilities, contributed to the development of Tejas.

How will it help the Indian Air Force?

The Mk-1A induction is important for the IAF as it seeks to restore its fighter strength towards the sanctioned 42 squadrons. Its current strength of 29 squadrons is the lowest since the 1960s, according to TOI. Several squadrons have been number-plated, or stood down, due to a shortage of fighter aircraft.

The IAF already operates two Tejas squadrons - No. 18 Squadron (Flying Bullets) and No. 45 Squadron (Flying Daggers). The first Mk-1A aircraft are expected to join No. 3 Squadron (Cobras), TOI reported.

Restoring fighter strength and accelerating indigenous aircraft programmes have also been identified as priorities by Dixit.

"Tejas Mk-1A and lI, AMCA, Indian sensors and Indian weapons are our highest priority. We will fight with Indian solutions, and we will hold them in numbers that meet our operational demands," he had said.

What's next for India's indigenous fighter programme?

Beyond the Mk-1A, the IAF is looking towards the Tejas Mk-2 and the Advanced Medium Combat Aircraft (AMCA), India's proposed fifth-generation fighter.

Dixit said the Tejas Mk-2 could roll out next year, while work on AMCA was also progressing.

"Now LCM Mark 2 will roll out maybe next year, and we are working very hard for AMCA also," he said.

He added that technologies developed through the Tejas programme would contribute to subsequent indigenous aircraft projects, including future stealth platforms.
Download
The Economic Times Business News App
for the Latest News in Business, Sensex, Stock Market Updates & More.
Download
The Economic Times News App
for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.
READ MORE
ADVERTISEMENT

READ MORE:

LOGIN & CLAIM

50 TIMESPOINTS

More from our Partners

Loading next story
Business News › News › Defence › Tejas Mk-1A: What’s new in India’s indigenous fighter jet, why has the IAF waited so long?
Text Size:AAA
Success
This article has been saved

*

+