IRNSS-1D launch tomorrow, countdown progressing smoothly

IRNSS-1D is the 4th in the series of seven satellites, planned by ISRO to put in place the Indian Regional Navigation Satellite System (IRNSS).

IRNSS-1D launch tomorrow, countdown progressing smoothly
CHENNAI: The stage is set for the launch of India's satellite IRNSS-1D tomorrow from Sriharikota onboard workhorse PSLV-C27 that would pave the way for the country's own navigation system on par with the GPS of the United States.

The 59.5-hour countdown for the launch scheduled at 5.19 PM from the Satish Dhawan Space Centre at Sriharikota, about 90 km from here, is progressing smoothly, Indian Space Research Organisation said today.

"The countdown (which began at 5.49 AM yesterday) is progressing smoothly. The mixed oxides of nitrogen oxidiser filling operation of fourth stage has been completed," ISRO sources said.

The launch originally scheduled for March 9 was deferred after an anomaly was found in a telemetry transmitter.

IRNSS-1D is the fourth in the series of seven satellites, planned by ISRO to put in place the Indian Regional Navigation Satellite System (IRNSS), currently under development.

The IRNSS system, targeted to be completed by this year at a total cost of Rs. 1,420 crore, will be targeted at South Asia and is designed to provide accurate position information services to users in the country as well as the region extending up to 1,500 km from its boundary.
ADVERTISEMENT

IRNSS' applications include terrestrial and marine navigation, disaster management, vehicle tracking and fleet management, navigation aide for hikers and travellers, visual and voice navigation for drivers.

While four satellites would be sufficient to start operations of the system, the remaining three would make it more accurate and efficient, ISRO said.

The first three satellites in the IRNSS series were launched from Sriharikota on July 1, 2013, April 4 and October 16 last year respectively.

Similar to the previous three launches, ISRO would use the "XL" version of the Polar Satellite Launch Vehicle (PSLV), its most reliable rocket, for IRNSS-1D which will have a mission life of 10 years.
ADVERTISEMENT

This is the eighth time XL version is being used after Chandrayaan-I, GSAT-12, RISAT-1, IRNSS-1A, Mars Orbiter Spacecraft, IRNSS-1B and IRNSS-1C.

The 44.4 metre tall PSLV-C27 which has a lift off mass of 1,425 kg PSLV-C27 will put the satellite in Geosynchronous orbit at 111.75 degree east longitude with 30.5 degree inclination.
ADVERTISEMENT

The system would provide two types of services -- Standard Positioning Service, which is provided to all the users, and Restricted Service that is an encrypted service provided only to authorised users.
Download
The Economic Times Business News App
for the Latest News in Business, Sensex, Stock Market Updates & More.
Download
The Economic Times News App
for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.
Five path-breaking projects of ISRO under development
1/6
Hari Pulakkat, ET Bureau

ISRO has its hands full with new projects, some of which pushing up the potential use of space technology significantly. These include new heavy launch vehicles, cryogenic and semi-cryogenic engines, a moon and a solar mission and, if there is enough government support, human space missions as well.

Plus, you have air-breathing and reusable launch vehicles. And the turnaround seems to be complete...
Hari Pulakkat, ET Bureau

ISRO has its hands full with new projects, some of which pushing up the potential use of space technology significantly. These include new heavy launch vehicles..
Read More
A set of seven navigation satellites that will be controlled by the government. The PSLV has been launching three of them through last year, and four more need to be launched in the first half of this year for the constellation to be complete.

It will give India a full network of global positioning satellites for both civilian and military use.

In pic: IRNSS 1C. Image by ISRO
A set of seven navigation satellites that will be controlled by the government. The PSLV has been launching three of them through last year, and four more need to be launched in the first half of thi..
Read More
To be launched later this year, the Astrosat will satisfy a long-standing need among India's astronomy community. The onboard equipment has mostly been built at the Tata Institute of Fundamental Research (TIFR) with ISRO chipping in with some parts.

It is a general purpose astronomy satellite capable of investigating a wide range of astronomical phenomena.
To be launched later this year, the Astrosat will satisfy a long-standing need among India's astronomy community. The onboard equipment has mostly been built at the Tata Institute of Fundamental Rese..
Read More
One of ISRO's most challenging tasks is to develop a vehicle capable of launching 4-tonne satellites into geostationary orbit. The current GSLV can go up to 2.2 tonnes.

GSLV Mark III, which has completed one flight with a dummy upper stage, has to wait for another two years for the full cryogenic stage to be developed. It is also to be developed as a human-rated vehicle later.

In pic: GSLV Mark III. Image by ISRO
One of ISRO's most challenging tasks is to develop a vehicle capable of launching 4-tonne satellites into geostationary orbit. The current GSLV can go up to 2.2 tonnes.

GSLV Mark III, which h..
Read More
India had built its own cryogenic engine based on a Russian design, but neither the Indian nor the Russian engines have enough thrust to put a 4-tonne satellite into orbit.

The completely indigenous cryogenic engine, now under development, will have three times the thrust and can put 4 tonnes satellites into orbit. It is being tested, and complete delivery will take 2 more years.

In pic: Indigenous cryogenic engine in GSLV-D5. Image by ISRO
India had built its own cryogenic engine based on a Russian design, but neither the Indian nor the Russian engines have enough thrust to put a 4-tonne satellite into orbit.

The completely ind..
Read More
After the success of the moon orbiter (Chandrayaan I), ISRO is now developing a moon rover (Chandrayaan II). It has two parts; the rover and the orbiter. The rover will land softly and explore lunar soil, while the orbiter will take this data and relay it to the earth.

Chandrayan II is not likely to have payloads from other countries. The launch time will be some time around two years from now.

In pic: Chandrayaan I. Image by ISRO
After the success of the moon orbiter (Chandrayaan I), ISRO is now developing a moon rover (Chandrayaan II). It has two parts; the rover and the orbiter. The rover will land softly and explore lunar ..
Read More
READ MORE
ADVERTISEMENT

READ MORE:

LOGIN & CLAIM

50 TIMESPOINTS

More from our Partners

Loading next story
Business News › News › Science › IRNSS-1D launch tomorrow, countdown progressing smoothly
Text Size:AAA
Success
This article has been saved

*

+