Delhi-Dehradun expressway: Workers seen clearing water using hands days before the inauguration of Rs 12K crore highway by PM Modi

Days before its inauguration, workers were seen manually clearing stagnant water from the Rs. 12,000 crore Delhi-Dehradun Economic Corridor, using basic tools. This rush to meet Prime Minister Modi's April 14 inauguration date highlights the proje...

TOI.in
Workers seen clearing the water from the Rs 12,000 crore Delhi-Dehradun expressway using hands.
Workers were seen manually clearing stagnant water from the carriageway of the Rs 12,000 crore Delhi-Dehradun Economic Corridor just days before its scheduled inauguration, using the most basic technology, reports TOI.

Four workers were seen using plastic containers to scoop up water and throw it onto the opposite side of the road, while a tractor bearing the NHAI logo stood nearby. “The drain was completely choked. We have no choice but to collect the stagnant water in containers and throw it away to clear the stretch,” one worker told TOI.

Also Read- 2nd puc result 2026 Live


Rush to meet inauguration deadline

The manual intervention comes as authorities race to prepare the expressway for its expected inauguration by Narendra Modi on April 14.

The expressway begins near Akshardham Temple and passes through Baghpat, Baraut, Shamli and Saharanpur before reaching Dehradun. Designed as a six-lane access-controlled highway, it will allow vehicles to travel at speeds of up to 100 km/h.

Key infrastructure features and interchanges

Officials said the project is expected to significantly improve connectivity between the national capital and Uttarakhand, benefiting both daily commuters and tourists.
ADVERTISEMENT

The corridor includes seven interchanges, two rail overbridges, 10 major bridges and 14 wayside amenities aimed at improving commuter convenience and safety.

Wildlife protection measures integrated into design

A key highlight of the project is a 12-km elevated stretch passing through Rajaji National Park, designed to minimise disruption to wildlife movement.

To ensure ecological safety, the expressway incorporates two 200-metre elephant underpasses and six dedicated animal crossings, enabling free movement of wildlife and reducing the risk of road accidents.

Link to pilgrimage routes and regional highways

The expressway also includes a spur connecting to Haridwar and will integrate with the Char Dham Highway network, improving access to major pilgrimage destinations and hill stations in Uttarakhand and neighbouring regions.
ADVERTISEMENT

(With inputs from TOI)
Download
The Economic Times Business News App
for the Latest News in Business, Sensex, Stock Market Updates & More.
Download
The Economic Times News App
for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.
READ MORE
ADVERTISEMENT

READ MORE:

LOGIN & CLAIM

50 TIMESPOINTS

More from our Partners

Loading next story
Business News › News › Trending › Delhi-Dehradun expressway: Workers seen clearing water using hands days before the inauguration of Rs 12K crore highway by PM Modi
Text Size:AAA
Success
This article has been saved

*

+