In 1972, FHWA used 5 inches of scrubber waste in a parking-area base at Washington's Dulles Airport. 2 years later, wet weather caused the experimental base to soften and be replaced
Early tests explored scrubber waste for road bases and subbases. Florida projects between 1977 and 1989 showed highly satisfactory performance. Pennsylvania roads survived severe freeze-thaw conditions, proving successful. Texas and Ohio tests ...

The material, known as flue gas desulfurization (FGD) scrubber waste, comes from pollution-control equipment and was tested as a possible material for road bases and subbases.
FGD scrubber waste gets an early road-building test
One of the earliest known applications took place during the TRANSPO'72 International Transportation Exposition at Dulles Airport near Washington, D.C. The Federal Highway Administration used part of a new 100-acre parking area for the experiment.The 5-inch compacted base contained 3% lime, 59% fly ash, 17% bottom ash, 13% crushed limestone and 8% dewatered FGD material.
The test indicated that FGD scrubber waste had potential for highway base construction. However, the section softened and lost density and was eventually removed and replaced.
FGD material was later tested in Florida, Pennsylvania, Texas and Ohio.
Florida projects test scrubber waste in roads and parking lots
Florida had at least 12 projects using FGD material between 1977 and 1989. They included roads, parking lots, a landfill access road, a truck haul road and a heavy steel storage yard.The bases were 6–12 inches thick, and at least 100,000 tons of fixated FGD material were placed. The performance was described as highly satisfactory.
University of Florida testing also found that a lime-fly ash-dewatered FGD sludge known as "Poz-o-Tec" had better bearing strength than lime rock base.
Pennsylvania road survives severe freeze-thaw conditions
In 1977, an 800-foot section of a state secondary road in southwestern Pennsylvania was built using lime, fly ash, bottom ash and dewatered FGD material.The base was 10 inches thick and covered with a 2-inch bituminous concrete binder course and a 1-inch wearing surface.
After seven years, the project was considered fully successful. Despite severe freeze-thaw conditions, there were no potholes or broken areas, and periodic coring found the base intact.
Measured unconfined compressive strength increased from 720 psi after one year to 1,014 psi after seven years.
Texas test compares FGD material with gravel
In December 1993, Texas A&M University built two FGD test sections, each 18 feet wide, 300 feet long and 12 inches thick.One section used fixated FGD sludge with self-cementing fly ash, dewatered FGD sludge and coal bottom ash. The other used fixated FGD material blended with Type II Portland cement.
A 300-foot control section made with crushed iron ore gravel was placed between the two test sections.
After two years, both FGD sections had significantly higher strength and stiffness than the control section and were described as showing successful performance to date.
Ohio haul road tests treated FGD material
In June 1995, a 250-foot test section was built as part of a 750-foot haul road at the Gavin power plant in Cheshire, Ohio.The final base used 40% bottom ash, 60% fixated FGD material and 7% Portland cement. It was covered with three inches of asphalt.
Heavy trucks used the road daily. The test section survived one winter and more than a year without noticeable distress.
How scrubber waste is prepared for road construction
FGD material generally needs to be dewatered and stabilized before it can be compacted.After dewatering, calcium sulfite scrubber material can have a toothpaste-like consistency and contain about 25–50% solids. Belt filter presses or centrifuges can be used to remove water.
The material can then be stabilized with quicklime, Class F fly ash, Class C fly ash or Portland cement. At least 65–70% solids are generally needed for a compactable consistency.
Testing shows FGD material can gain strength
During treatment, moisture content can fall from about 60% in slurry form to around 25% after dewatering and 15–20% after fixation. Permeability can also decline from about 8×10^-5 cm/s in slurry form to as low as 5×10^-8 cm/s after fixation, as per a FHWA report.Seven-day testing found unconfined compressive strengths of about 200–400 psi for pozzolanic mixtures and 600–900 psi for mixtures using Portland cement or Class C fly ash. Strength can exceed 2,000 psi after a year or more.
Projects show potential for road bases
The demonstrations in Florida, Pennsylvania, Texas and Ohio indicate that fixated FGD scrubber material can be used in road bases and other heavy-duty applications when it is properly prepared and the road is properly built.The Economic Times Business News App for the Latest News in Business, Sensex, Stock Market Updates & More.