Uttarkashi tunnel collapse: Vertical drilling underway at the site to rescue 41 workers

Vertical drilling on top of the partially-collapsed Silkyara-Barkot tunnel in Uttarkashi is currently underway, with 86 metres of digging required to reach the 41 workers who have been trapped for two weeks now.
Share this Video
appinstlBnr
Open in App
Success
This article has been saved