Talks with Sri Lanka on $5.19 billion road project to begin by October

The development follows Road Transport and Highways Minister Nitin Gadkari meeting Sri Lankan Prime Minister Ranil Wickremesinghe last week.

Talks with Sri Lanka on $5.19 billion road project to begin by October
NEW DELHI: Keen on fostering ties with neighbours, India is set to engage in high-level talks with Sri Lanka by October for an ambitious $5.19 billion road project to connect both the nations through a sea-bridge and an under water tunnel.

The development follows Road Transport and Highways Minister Nitin Gadkari meeting Sri Lankan Prime Minister Ranil Wickremesinghe last week with plans to expand the existing motor pact with Bangladesh, Bhutan and Nepal to other neighbouring countries.

Secretary-level talks between India and Sri Lanka have been decided by October in the island nation to take forward the project involving construction of a sea bridge and under-water tunnel linking 22 km stretch between Talaimannar, Sri Lanka and Dhanushkodi, India, official sources said.

Multilateral funding agency ADB has already shown interest to finance the $5.19 billion project, sources said adding, the bank has already agreed to finance infrastructure projects worth $8 billion under Bangladesh, Bhutan, India and Nepal (BBIN) Motor Vehicle Agreement, aimed at providing seamless flow of traffic among the nations.

Secretary-level talks are proposed as per convenience of Sri Lanka for a pre-feasibility study and finance by ADB, sources said.

"The officer level meeting will include apprising Sri Lanka about the developments related to implementing BBIN Motor Vehicle Agreement. The pact aims at facilitating cross border movement of all types of vehicles in the region. Since there is a provision of other countries in the region joining the pact, Sri Lanka may like to consider this for further improving connectivity between the region," an official said.
ADVERTISEMENT

India wants Sri Lanka to join the BBIN Motor Vehicle Agreement, the official said.

The project was signed in June this year in Bhutan during Gadkari's visit there.

Work on the $8 billion road connectivity projects under BBIN is likely to be completed within two years.

India is also looking to enter into another landmark motor pact with Myanmar and Thailand by year end.
ADVERTISEMENT

Gadkari had earlier said there is a missing link of narrow corridor of about 22 km in connectivity to Sri Lanka from ameshwaram, which is presently being serviced through makeshift ferry service arrangements.

"We are working on the project and as soon as it is completed, Trans Asia Road and transport network could be extended to Sri Lanka," Gadkari had said.
Download
The Economic Times Business News App
for the Latest News in Business, Sensex, Stock Market Updates & More.
Download
The Economic Times News App
for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.
Nitin Gadkari's 5 big-ticket projects to modernise India's inland waterways
1/6
Text: Binoy Prabhakar, ET Bureau and Ministry of Shipping, IWAI

Shipping minister Nitin Gadkari is steering the Modi government’s most ambitious infrastructure push yet as he prepares to modernise India’s old and long ignored inland waterways.

Here are some of Gadkari’s big-ticket maritime projects
Text: Binoy Prabhakar, ET Bureau and Ministry of Shipping, IWAI

Shipping minister Nitin Gadkari is steering the Modi government’s most ambitious infrastructure push yet as he prepares ..
Read More
India has numerous rivers, canals, creeks, lakes that can be developed as inland waterways, but only five waterways have been declared as national waterways (NWs)

Due to the urgent need for an alternative mode of transport — to supplement the choked road and rail networks — the long waiting period for developing NWs must be curtailed.

The answer is declare all the identified waterways as NWs through a single legislation instead of going through the motion of enacting a separate legislation for each.

Examples:ASSAM: Barank, Subansiri, Lohit, Gangadhar, Aai, Beki, Puthimari, Kapi & Dehing

BIHAR:Ganbdak, Koshi & Sone

GOA: Mandovi, Zuari, Mapusa, Chapora & Cumberjua Canal

DELHI:Yamuna
India has numerous rivers, canals, creeks, lakes that can be developed as inland waterways, but only five waterways have been declared as national waterways (NWs)

Due to the urgent need for a..
Read More
All the five declared NWs cannot be joined to create a national waterway grid, but at least three can form a grid in the East.

Highlights of the grid:

National Waterways: 5

Total Length (km): 4,382 + 1,665 km of water network in Bangladesh

Total No. of Terminals: 70

No. of States Covered: 15

Total Traffic (2011-12): 287 (Million Tonnes)(All modes)

Terminals Identified for Development Based on Traffic Potential: 31
All the five declared NWs cannot be joined to create a national waterway grid, but at least three can form a grid in the East.

Highlights of the grid:

National Waterways: 5<..
Read More
Estimated cost of the project: Rs 4200 crore

World Bank-assisted project to develop for navigation the Haldia–Allahabad stretch on National Waterways-1

NW-1 passes through four states and potentially serves the cities of Haldia, Howrah, Kolkata, Bhagalpur, Patna, Ghazipur, Varanasi and Allahabad and several industries located along the Ganga basin

Rail and road corridors of this region are already saturated

So the development of NW-1 would offer an alternative mode of transport Huge quantities of bulk cargo can be transported and boost economic development of the region.
Estimated cost of the project: Rs 4200 crore

World Bank-assisted project to develop for navigation the Haldia–Allahabad stretch on National Waterways-1

NW-1 passes through fou..
Read More
Key objectives:

To make it a thriving river

Cleaning the river

Beautify and create an environmental and social friendly river front

Make the river usable for navigation, water transport etc.
Key objectives:

To make it a thriving river

Cleaning the river

Beautify and create an environmental and social friendly river front

Make the river usable for na..
Read More
Easier Immigration Procedures : Visa on Arrival shortly to be given to 114 countries at airports must be extended to seaports

: Cruise passengers after local sight-seeing trips have to return to their ships before sailing. They cannot fly out of the country and have to move in a group

Easier Customs Procedures: The insistence on the so-called store list to be declared at the first Indian port will be dispensed with as this list runs into 2,000-3,000 pages

A store list also has to have foreign currency holdings of vessels; this has to be declared at all Indian ports. Tallying is trouble.

Cabotage Waiver: Currently foreign vessels calling on Mumbai cannot take Indian passengers who may want to go up to Goa or Kochi.

Allowing Indian passengers this facility means they needn’t fly abroad to experience cruise tourism

Development of Lakshadweep as a cruise destination: The Lakshadweep Islands can be developed like the Maldives The Maldives makes more than $1 billion from cruise tourism annually

Even Indians require permits to enter Lakshadweep and tourist infrastructure is grossly inadequate
Easier Immigration Procedures : Visa on Arrival shortly to be given to 114 countries at airports must be extended to seaports

: Cruise passengers aft..
Read More
READ MORE
ADVERTISEMENT

READ MORE:

LOGIN & CLAIM

50 TIMESPOINTS

More from our Partners

Loading next story
Business News › News › Economy › Infrastructure › Talks with Sri Lanka on $5.19 billion road project to begin by October
Text Size:AAA
Success
This article has been saved

*

+