Rs 926-crore six-lane tunnel project on Pune-Satara highway to be completed by 2023: Nitin Gadkari

"He said the existing 'S' curve in Satara-Pune direction shall be completed soon that would lead to drastic reduction in accident risks. The total capital cost for the 6.43 km long project is approximately Rs 926 crore and is expected to be comple...

ANI
The tunnel is going to enhance connectivity and, most importantly, provide direct benefits to commuters through their value over time and value over cost savings, Gadkari said.
The six-lane tunnel on Pune-Satara highway being constructed at an estimated cost of Rs 926 crore is expected to be completed by March 2023, Union road transport and highways minister Nitin Gadkari said on Wednesday. The new tunnel at Khambatki Ghat on National Highway-4 is a twin tunnel with three lanes each, the minister said, according to a transport ministry statement.

"He said the existing 'S' curve in Satara-Pune direction shall be completed soon that would lead to drastic reduction in accident risks. The total capital cost for the 6.43 km long project is approximately Rs 926 crore and is expected to be completed by March 2023," it said.

The minister said average travel time at Pune-Satara and Satara-Pune stretch through Khambataki Ghat is 45 minutes and 10-15 minutes, respectively. With the completion of this tunnel, average travel time shall be reduced to 5-10 minutes.


The tunnel is going to enhance connectivity and, most importantly, provide direct benefits to commuters through their value over time and value over cost savings, Gadkari said.
Download
The Economic Times Business News App
for the Latest News in Business, Sensex, Stock Market Updates & More.
Download
The Economic Times News App
for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.
READ MORE
ADVERTISEMENT

READ MORE:

LOGIN & CLAIM

50 TIMESPOINTS

More from our Partners

Loading next story
Business News › News › Economy › Infrastructure › Rs 926-crore six-lane tunnel project on Pune-Satara highway to be completed by 2023: Nitin Gadkari
Text Size:AAA
Success
This article has been saved

*

+