Rs 98 crore Vande Bharat depot at Lower Parel: How Railway plans to transform Dadar into a bigger long-distance train hub with new facilities
Western Railway plans to build a Rs 98 crore Vande Bharat maintenance and coaching depot at Lower Parel (Currey Road) in Mumbai. Spread across 55,000 square metres, the proposed facility will feature pit lines, stabling lines and repair infrastruc...
The development comes as Western Railway looks to expand its infrastructure to accommodate additional long-distance Mail and Express services and support the maintenance requirements of Vande Bharat trains.
Read more - Cabinet approves delimitation Bill with 50% seat increase for all states; current population-based representation ratio to remain unchanged till 2051
Lower Parel Vande Bharat depot project to be developed in two phases
The proposed coaching and maintenance depot will be constructed in two phases, with a total estimated investment of Rs 98 crore.Western Railway has sanctioned Rs 49 crore for the first phase, while the second phase, also estimated to cost Rs 49 crore, is awaiting approval.
The planned facility will have the following infrastructure:
- Two full-length pit lines for Vande Bharat train maintenance.
- Six stabling lines to accommodate additional trains.
- Two sick lines for trains requiring repairs.
- One shunting neck to facilitate train movements within the depot.
How the new Lower Parel depot will boost Dadar train capacity
The proposed facility is expected to improve train operations at Dadar by allowing Western Railway to undertake primary maintenance of trains originating from the station.Currently, Dadar primarily handles trains that return to the platform after completing their journeys. The new depot will provide the infrastructure needed to maintain trains before they begin their onward journeys.
"The new depot will enable Dadar to originate primary-maintained trains, instead of handling only platform-return trains, giving Western Railway greater flexibility in planning long-distance train operations," chief public relations officer, Western Railway, Arun Kumar Meena, told TOI.
This is expected to improve operational flexibility and help the railway zone plan additional long-distance services from Mumbai.
New depot to be connected to Dadar and Mumbai Central
The proposed Lower Parel facility will be connected to Dadar and Mumbai Central through the existing and upcoming sixth-line infrastructure.It will also supplement the existing maintenance facilities at Mumbai Central Coaching Depot, providing additional capacity for primary maintenance and stabling of long-distance Mail and Express trains.
The additional infrastructure is expected to ease pressure on existing coaching facilities and support the planned expansion of long-distance train services from Mumbai.
Why the Lower Parel depot project matters for Mumbai railways
The proposed depot is significant for Western Railway's efforts to expand its long-distance train operations while accommodating the growing maintenance requirements of its fleet.By creating dedicated infrastructure for Vande Bharat trains and adding stabling and maintenance facilities, the project could improve train-handling capacity at Dadar and Mumbai Central.
The relocation of Central Railway's Store Depot to Thakurli will also free up the land required for the proposed facility at Lower Parel.
Inputs from TOI
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.