Agartala to get broad gauge connectivity by 2016
If the required fund is available, North-East Frontier Railway will be able to extend the broad gauge rail connectivity to Agartala within the stipulated time.
"Agartala is scheduled to get broad gauge facility by March 2016," NFR Chief Engineer (Construction) Harpal Singh told reporters.
"If the required fund is available, NFR will be able to extend the broad gauge rail connectivity to Agartala within the stipulated time," he said.
Singh said the railway extension work up to Sabroom in South Tripura district would also be completed by the same time.
Works for conversion in BG a small metre gauge track from Lumding to Silchar in Assam was in full swing and likely to be completed by March 2015, he said.
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.