Transportation

Nitin Gadkari teases India with glimpses of country's first commercial ropeway

PM inaugurated
Agencies
1/6
PM inaugurated


The Prime Minister praised the construction of a 3.85-kilometer-long public transportation ropeway in Varanasi, which cost Rs 644 crore
Will run 16 hours every day
Agencies
2/6
Will run 16 hours every day
A total of 153 gondolas or cabins, each holding ten passengers, will be used. Adding to that Cantt to Gudaulia can be reached in 16 minutes as opposed to the current travel time of at least 45 minutes.
 Features of the Varanasi Ropeway Project
Agencies
3/6
Features of the Varanasi Ropeway Project
This is the first urban ropeway project under Parvatmala Pariyojana. Also, It can move 3,000 people an hour in each direction.
Nitin Gadkari tweeted
4/6
Nitin Gadkari tweeted
Sharing a tweet from Shri Nitin Gadkari, Union Minister for Road, Transport, and Highways, about the 3.85 km public transportation ropeway being built in Varanasi for Rs 644 crore.
Cost of the Varanasi Ropeway Project
Agencies
5/6
Cost of the Varanasi Ropeway Project
The project is expected to cost approximately Rs. 644 crores.
Project map for the Varanasi Ropeway
Agencies
6/6
Project map for the Varanasi Ropeway
The Passenger Ropeway from Varanasi Cantt station to Godowlia was officially opened by the prime minister. Five stations will be included in the 3.75 km long ropeway system: Vidya Peeth, Bharatmala Mandir, Rath Yatra, Girja Ghar, and Godowlia Chowk. It will make moving around Varanasi easier for pilgrims, tourists, and locals.
Open in App
Success
This article has been saved