NTPC commissions 15 MW floating solar capacity in Andhra Pradesh's Simhadri
"Consequent upon successful commissioning of 15 MW capacity, Simhadri Floating Solar PV Project at Simhadri, Andhra Pradesh is hereby declared on commercial operation w.e.f. 10:00 Hrs. of 21.08.2021," a BSE filing said.
"Consequent upon successful commissioning of 15 MW capacity, Simhadri Floating Solar PV Project at Simhadri, Andhra Pradesh is hereby declared on commercial operation w.e.f. 10:00 Hrs. of 21.08.2021," a BSE filing said.
With this, the installed capacity of NTPC and NTPC Group stands at 53,475 MW and 66,900 MW, respectively.
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.