JSW Neo Energy bags 500MW solar project from Solar Energy Corporation of India
JSW Energy's subsidiary, JSW Neo Energy, secured a contract from SECI to develop a 500 MW ISTS-connected solar project with 250 MW/500 MWh of energy storage systems. This increased the company's locked-in generation capacity to 16GW and energy sto...
JSW Neo has also received a Letter of Award (or LoA) from Karnataka Renewable Energy Development Ltd (KREDL) for setting up a 300 MW solar project at Pavagada Solar Park, Karnataka, the company said in a separate statement.
Subsequent to this capacity award, the company's total locked-in generation capacity increased to 16GW and the total locked-in energy storage capacity increased to 4.2 GWh.
The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW at present.
The company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030.
JSW Energy has set an ambitious target of achieving Carbon Neutrality by 2050.
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.