Bhilai Steel Plant saleable steel production up 2.1% in April 2013-Jan 2014
Production of cast steel at steel melting shop (SMS-2) during the ten-month period was the best-ever since inception.
Production of cast steel at steel melting shop (SMS-2) during the ten-month period was the best-ever since inception.
At 2.29 million tonnne (mt) it surpassed the previous best of 2.26 mt in Apr’09-Jan’10(FY10). This included best ever production of 1.52 mt of cast slabs, as against previous best of 1.47 mt in 2010-11. Production of 1.85 lakh tonnes (lt) of High Tensile plates for home sales and export during the ten-month period has been the best ever since inception, surpassing the previous best of 1.36 lt in 2012-13.
Loading of 2.23 lt of 26 metre rails for Indian Railways was also the best, surpassing the previous best of 1.97 lt in 2009-10.
The Plant loaded 1.41 mt of steel for direct despatches during the April to January period of current fiscal year, surpassing its previous best of 1.38 mt in 1999-2000.
In the area of techno-economics, the plant recorded its best ever energy rate of 6.473 GCal per tonne of crude steel for the ten-month April to Jan period of current FY, surpassing the previous best of 6.653 in 2009-10. Labour productivity of 349.7 tonne/man-year has also been the highest for the period, surpassing the previous best of 330.2 in 2012-13.
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.