CIL-led consortium receives LoI from govt to set up rare earth permanent manufacturing facility
Coal India Ltd has received a letter of intent to manufacture rare earth permanent magnets with a capacity of 1,200 tonnes. This project will take place over seven years, with two years for pre-construction and five years for operations. The Union...
CIL, as lead member of the consortium with Non-Ferrous Materials Technology Development Centre (NFTDC), has been declared L2 bidder.
In a filing to the BSE, the PSU said a "Letter of Intent (LoI) dated 19.11.2026 (has been) issued by MHI under the Scheme to Promote Manufacturing of Sintered Rare Earth Permanent Magnet."
The project is scheduled for execution over a seven-year period, comprising a two-year pre-construction phase and a five-year operational phase.
In November 2025, the Union Cabinet under the chairmanship of Prime Minister Narendra Modi jadapproved the "Scheme to Promote Manufacturing of Sintered Rare Earth Permanent Magnet (REPM)" with a financial outlay of Rs 7,280 crore.
The scheme, a first-of-its-kind initiative, aims to establish a total capacity of 6,000 metric tonnes per annum (MTPA) of integrated Rare Earth Permanent Magnet manufacturing facilities in India, thereby enhancing self-reliance and positioning India as a key player in the global rare earth permanent magnet market.
The Ministry of Heavy Industries (MHI) had received 20 bids under the scheme to promote manufacturing of sintered rare earth permanent magnet.
Rare earth permanent magnets are among the most powerful magnets in the world and are widely used in electric vehicles, wind turbines, high-end electronics, aerospace and defence systems.
Coal India Ltd, which accounts for over 80 per cent of domestic coal production, had reported a 57 per cent increase in consolidated profit after tax (PAT) to Rs 6,547 crore in the September quarter, aided by higher revenues.
The company had posted a consolidated PAT of Rs 4,167 crore in the year-ago period.
Consolidated revenue from operations rose 20.8 per cent to Rs 44,179 crore in the second quarter, up from Rs 36,553 crore in the corresponding quarter of the previous fiscal year.
CIL has a coal production target of 815 million tonnes and an offtake target of 850 MT for 2026-27.
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.