Data centre surge triggers CEA study on grid stability
The Central Electricity Authority has formed a committee to evaluate data centre effects on power systems and grid stability. This initiative responds to the growing demand for electricity from data centres across various states in India. Odisha r...
The committee is also examining potential cybersecurity risks, as the power sector was a key target of cyberattacks during the India-Pakistan conflict amid Operation Sindoor, people familiar with the development told ET.
The concern is already evident on the ground, with states flagging the need for massive electricity supplies to service data centres in the near future.
Also read: Power Mech Projects bags Rs 549 cr O&M order from Adani Group entity
The immediate trigger for setting up the committee came after the Eastern Regional Power Committee recently red-flagged concerns raised by Odisha over grid-linked operational challenges arising from "large collective market purchases" by the industry, according to minutes of CEA committee meetings reviewed by ET.
At a meeting of CEA's National Committee on Transmission in June, the Central Transmission Utility of India (CTUIL) noted that West Bengal was projecting "a substantial load" of 200-300 MVA (MegaVolt-Amperage) for data centres in and around New Town and Rajarhat, with 24x7 load characteristics in the coming years.
The country's installed data-centre power capacity has grown to 1,575 MW from 375 MW in 2020, according to a government statement in August. The CEA expects electricity demand from data centres to reach about 17 GW by 2031-32.
Currently, data centres are located largely in Mumbai, Navi Mumbai, Chennai, Hyderabad, Bengaluru, Delhi NCR and Jamnagar, but are fast expanding to other states.
The recently instituted panel will examine the operations, policy and regulatory aspects related to large data centres and submit its findings to CEA's National Power Committee (NPC), ET has gathered.
Also read: Rains ease peak power demand in September
The committee - which has representatives on board from various stakeholder bodies including National Load Dispatch Centre (NLDC), tech industry body Nasscom and CTUIL - has already held multiple meetings. Grid Controller of India (Grid-India) has submitted a technical note on the same.
The NPC has already held a round of discussions in its February meeting, where members noted data centres typically exhibit high constant power loads, with surges linked to global time zones and possible "impact on grid behaviour."
It was felt that this warranted a study to assess the electricity load behaviour patterns of data centres, their implications and impact on grid stability, and the possible need for separate classification or regulatory treatment.
The Economic Times News App for Quarterly Results, Latest News in ITR, Business, Share Market, Live Sensex News & More.